Shipping Schedule - Next 36 hours

Last Updated:
Duty Allocator: Derek - (09) 432 7655
Update Status: Updated
Time Vessel Name Movement Berth Draft Pilot WBM DH WBM2 DH2 TM TE TM2 TE2 Lines people Pickup Remarks
17:00 KAPUA DEP MP3 1600 No NTL resources required at this stage
Time Vessel Name Movement Berth Draft Pilot WBM DH WBM2 DH2 TM TE TM2 TE2 Lines people Pickup Remarks
05:00 MOANA CHIEF ARR MP3 KB RC DP KR BN DM OM DP / GL / RC / SM 0400 HW 0113
Berth marks 405 - 580. Bridge mark 564 (Bridge to stern 15.90)
09:30 PEC ASSESSMENT - M.TURNER (MVAC @ FWB 0930) ARR PTLD DG / RO ABM SM 0900 - PB crew Pilot boat = Jack Guy
MVAC arriving at FWB at 0930 for transit to PTLD.
Pilot to board off the log berth.
Pilot boat crew to pick up pilot from MVAC (pilot boarding ladder) and return to Marsden Point.
Plant hire sheet please.
21:00 MOANA CHIEF DEP MP3 RO DM ABM KR GS CS BN ABM / DM / IP / MK 2000 Pilot boat=Jack Guy
Time Vessel Name Movement Berth Draft Pilot WBM DH WBM2 DH2 TM TE TM2 TE2 Lines people Pickup Remarks
00:00 GEM TOPAZ DEP R1 8.30 (Est) RO DM ABM KR GS CS BN IP / LC / MK / SM 2300 22/7 Pilot boat=Jack Guy
Displacement 31641

Important Notes

Time Vessel Name Berth Personnel Remarks
08:00 SAFETY ADVISORY - DIVER ACTIVITY AT NORTHPORT ADVICE Divers will be operating in and around Northport berths again today (Day 2). Please be aware of increased underwater activity and follow all operational safety directions.

⚠️ Key Information
Diver operations - Divers will only enter the water once advised it is safe, based on scheduled vessel movements.
Vessel movements - All marine crew must maintain clear communication with the dive team and/or Port Services before starting engines or moving vessels.
Safety communication - Continuous radio coordination is required throughout the operation window
08:00 ADVISORY - BERKELEY OUT OF SERVICE UNTIL FURTHER NOTICE ADVICE Berkeley will be withdrawn from service from 0800hrs today until further notice while the port‑side gearbox and cooler undergo pressure testing and repair.
We have been advised that this will take around 1.5‑days to complete diagnostics and repairs. The vessel will return to service once the gearbox system is fully repaired and cleared for operation.

The Jack Guy will return to service as the pilot boat until the Berkeley is repaired.